Testing & Compliance Service
Remedial Works
Targeted remedial works following EICR findings — C1 dangerous and C2 potentially dangerous defect clearance, distribution board upgrades, circuit replacement and BS 7671 re-certification.
What electrical remedial works actually have to deliver
01
C1 dangerous findings that require immediate action
C1 observations present a risk of injury and must be addressed without delay. We provide a rapid response to C1 defect clearance — assessing the site, producing a scope and commencing works within a timeframe that removes the immediate danger.
02
A remedial schedule from an EICR you didn't commission
We carry out remedial works from EICRs produced by other inspectors, not just our own. We review the report, interpret the findings against the current installation and produce an accurate scope before any works commence.
03
Prioritising a large remedial schedule against a limited budget
Not every remedial programme can be addressed at once. We work with the estate manager to sequence C1 and C2 works against the available budget, providing interim risk control measures where necessary while the remedial programme is phased.
04
Re-certification after works are complete
Remedial works must be re-tested and an updated EICR or minor works certificate issued. We provide this documentation as a matter of course — so the building's compliance record is closed out at the end of every remedial visit.
Technical detail
Standards & compliance
- BS 7671 18th Edition — remedial circuit works
- IET Guidance Note 3 — re-inspection after remedials
- NICEIC certification for all completed works
- Minor works certificates for individual circuit remedials
- Electrical Installation Certificate (EIC) for new circuits
Common remedial scope
- Distribution board and consumer unit replacement
- RCD and RCBO protection upgrades
- Earthing conductor and bonding replacements
- Socket outlet and switch replacement
- Cable and containment defect clearance
Specialist remedials
- Deteriorated MICC cable replacement
- Rewire of specific circuits or zones
- Earth electrode installation and testing
- Surge protection device (SPD) installation
- Arc fault detection device (AFDD) installation
Documentation
- Updated EICR or satisfactory partial re-test certificate
- Minor works certificates for each remedial item
- Updated circuit schedule at completion
- Photographic record of defect and remedial
- Risk assessment and method statement (RAMS) provision

The Numbers
C1
C1 observations present a risk of injury. We provide a rapid response scope and commencement to remove the immediate danger without delay.
C2
C2 observations must be addressed within a reasonable period. We plan C2 remedials into a programmed schedule with interim risk controls where required.
100%
Every remedial visit closes with updated certification — minor works certificate, partial re-test or updated EICR depending on the scope.
Why specify Con-Tec
Remedials Done, Records Closed
Our Remedial Works Approach
01
EICR Review & Scope
We review the EICR findings, inspect the installation where required and produce an accurate remedial scope with cost before any works commence.
02
Priority Sequencing
C1 items scoped for immediate response; C2 items scheduled and phased against the available budget, with interim controls documented.
03
Remedial Works
NICEIC-approved engineers carry out defect clearance to BS 7671, with photographic records of each item before and after.
04
Re-Certification
Updated certification issued at every visit — minor works certificates, partial re-test results or updated EICR as appropriate to the scope.
1 / 4
What our clients say
“Just a note to say that John and his team from Con-Tec Solutions have produced another outstanding performance on the refit of lighting in the atrium at BCW. Work carried out was done at an extremely high standard. All relevant risk assessments and method statements brought to site and adhered to. These guys really do set the standards that we should be expecting from all our contractors.”
Grant Metcalf, Eric Wright Facilities Management
Get a Quote
Ready to Start a Project?
Our team is on hand to discuss your commercial or industrial electrical requirements. Share your project details with us, and we’ll be in touch to discuss the scope, programme and a tailored, cost-effective solution.
