EV charge point design and installation for commercial and industrial premises — OZEV guidance compliance, DNO application, smart load management, grid reinforcement and full BS 7671 commissioning.

What a commercial EV charging project actually has to solve

01

An existing supply that can't carry the EV load

Adding 7kW charge points at scale imposes significant additional load on the site supply. We carry out a load flow assessment and supply capacity review before specifying any charge point — so the electrical scope is fully costed before the project begins, and supply upgrades are planned rather than reactive.

02

Peak demand charges triggered by simultaneous charging

Unmanaged charging across a large fleet or car park triggers demand peaks that increase both network capacity charges and energy costs. Smart load management systems distribute the available capacity across charging sessions — we design and commission these systems as part of the installation.

03

A DNO application process you don't know how to manage

Larger EV installations require G99 notification or full engineering recommendation approval from the distribution network operator. We manage the full application process — including load flow modelling, protection coordination and formal DNO submission — so this doesn't become a programme blocker.

04

Future-proofing for a fleet that will grow

Installing the minimum number of charge points today at the minimum supply capacity creates an expensive upgrade problem tomorrow. We design EV infrastructure with the future fleet size in mind — providing supply headroom, cable routes and distribution capacity for the anticipated full deployment.

NHS
Eric Wright FM
Manchester Central
Beghelli Lighting
Thorn
CAFT - Children's Adventure Farm Trust
NHS
Eric Wright FM
Manchester Central
Beghelli Lighting
Thorn
CAFT - Children's Adventure Farm Trust

Technical detail

Standards & compliance

  • BS 7671 — EV charge point circuit requirements
  • OZEV PAS 1899 — electric vehicle smart charging
  • Engineering Recommendation G99 / G98
  • BS EN IEC 61851 — EV conductive charging systems
  • Workplace Charging Scheme (WCS) compliance

Charge point types

  • 7kW AC single-phase wallbox units
  • 22kW AC three-phase units
  • 50kW–150kW DC rapid chargers
  • Smart OCPP-connected charge point management
  • Tethered and untethered configurations

Electrical infrastructure

  • Supply capacity assessment and reinforcement design
  • Sub-main circuits from the main distribution board
  • Cable routes, containment and cable management
  • Load management system installation and commissioning
  • Earthing and protection to BS 7671 and charge point spec

Grid connection & documentation

  • DNO G99/G98 application management
  • Smart metering and sub-metering provision
  • As-installed drawings and circuit schedules
  • BS 7671 test certificates
  • OZEV Workplace Charging Scheme documentation
Con-Tec Solutions — commercial EV charging infrastructure

The Numbers

Charge points in one project

80

80 smart EV charge points installed across a multi-acre logistics depot — including DNO G99 application, grid reinforcement and load management system.

Grid capacity reinforced

5MW

New HV transformer and LV distribution network installed under a DNO Section 16 contestable works agreement on our largest EV infrastructure project.

Fleet coverage guaranteed

100%

Smart load management ensures all vehicles are charged by start of shift — without triggering demand penalty charges.

Why specify Con-Tec

EV Infrastructure Built for the Fleet You'll Have

01

Pre-works supply assessment

We assess supply capacity and load flow before specifying a single charge point — so the full electrical scope is costed before the project commits.

02

Smart load management as standard

We design and commission OCPP smart charging and load management systems as part of every commercial installation — not as an optional extra.

03

DNO application management end to end

G99 applications, load flow modelling, protection coordination and formal DNO approval managed from first submission through to commissioning confirmation.

04

Future-fleet capacity designed in

Distribution capacity, cable routes and earthing infrastructure sized for the anticipated full deployment — so adding charge points later is an extension, not a redesign.

01

Supply & Fleet Assessment

Load flow assessment, supply capacity review and fleet charging demand modelling before any design work begins.

02

Design & DNO Application

Charge point layout, sub-main circuit design, load management specification and G99/G98 application submitted at the start of the design stage.

03

Installation

Sub-mains, cable routes, charge points and load management system installed by NICEIC-approved engineers — coordinated with the car park or site programme.

04

Commission & Handover

Smart charging system commissioned and tested, full BS 7671 testing, DNO confirmation and documentation package at handover.

NICEIC Approved Contractor
Constructionline Gold Member
International Powered Access Fedaration
Prefabricated Access Suppliers & Manufacturers Association

1 / 4

What our clients say

“Just a note to say that John and his team from Con-Tec Solutions have produced another outstanding performance on the refit of lighting in the atrium at BCW. Work carried out was done at an extremely high standard. All relevant risk assessments and method statements brought to site and adhered to. These guys really do set the standards that we should be expecting from all our contractors.”

Grant Metcalf, Eric Wright Facilities Management

Get a Quote

Ready to Start a Project?

Our team is on hand to discuss your commercial or industrial electrical requirements. Share your project details with us, and we’ll be in touch to discuss the scope, programme and a tailored, cost-effective solution.