Testing & Compliance Service
Fixed Wire Testing in Manchester
Electrical Installation Condition Reports (EICR) for commercial, industrial and public sector premises — systematic inspection and testing to BS 7671, with prioritised C1/C2/C3 remedial schedules and digital records.
What a fixed wire testing programme actually has to deliver
01
An EICR that doesn't satisfy your insurer or landlord
Insurers, landlords and the Electricity at Work Regulations all require periodic inspection and testing of fixed electrical installations. Our EICR reports are produced to BS 7671 by qualified inspection and test engineers and carry NICEIC certification — a format that satisfies most insurer and landlord requirements.
02
Findings that are uncategorised and impossible to prioritise
An EICR that lists observations without a C1/C2/C3 classification leaves the building owner with no basis to prioritise remedial spend. Our reports categorise every finding, with a written remedial schedule ordered by priority.
03
Testing on a live site without disruption
Circuit testing typically requires brief supply interruptions. We plan all testing with the site manager and phase circuit groups to minimise the impact on occupiers — with clearly communicated outage windows and same-day restoration of every circuit.
04
Multiple sites with inconsistent documentation
Multi-site programmes require consistent methodology, comparable reports and a single documentation format. We apply standardised inspection procedures and submit reports in a uniform format — so the estate manager can compare findings directly across all sites.
Technical detail
Standards & compliance
- BS 7671 18th Edition — inspection and testing
- Electricity at Work Regulations 1989
- IET Guidance Note 3 — inspection and testing
- NICEIC EICR certification and registration
- Housing Act 2004 / The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
Inspection scope
- Visual condition inspection of all accessible wiring
- Distribution board and consumer unit inspection
- Circuit continuity and insulation resistance testing
- Earth fault loop impedance measurement
- RCD and RCBO operating time verification
Reporting
- Full EICR to BS 7671 Appendix 6 format
- C1, C2, C3 and FI observations coded and described
- Prioritised remedial schedule for the capital programme
- Digital report delivery and record retention
- Guidance on recommended re-inspection intervals
Testing equipment
- Calibrated multifunction test instruments
- Thermal imaging camera for hot-spot identification
- Power quality monitoring on request
- Test result digital upload and record management
- All equipment calibrated and within certification
The Numbers
47
Multi-site EICR programme across a North West local authority's entire public estate — 47 buildings with fully consistent documentation.
3,200+
Over 3,200 individual circuits inspected, tested and recorded across the 47-building programme.
100%
Full EICR documentation submitted for every building, with prioritised C1/C2/C3 remedial schedules ready for the capital programme.
Why specify Con-Tec
Inspection That Produces Actionable Records
Our Fixed Wire Testing Approach
01
Programme Planning
Outage windows agreed with the site manager, circuit groups phased to minimise disruption and access arrangements confirmed before testing begins.
02
Visual Inspection
Systematic visual condition inspection of all accessible wiring, accessories, switchgear and distribution equipment.
03
Circuit Testing
Continuity, insulation resistance, earth fault loop impedance and RCD testing of every circuit, with calibrated instruments and digital result upload.
04
EICR Report & Remedial Schedule
Full EICR to BS 7671 format, with C1/C2/C3 observations classified and a written remedial schedule submitted within 5 working days.
1 / 4
What our clients say
“Just a note to say that John and his team from Con-Tec Solutions have produced another outstanding performance on the refit of lighting in the atrium at BCW. Work carried out was done at an extremely high standard. All relevant risk assessments and method statements brought to site and adhered to. These guys really do set the standards that we should be expecting from all our contractors.”
Grant Metcalf, Eric Wright Facilities Management
Get a Quote
Ready to Start a Project?
Our team is on hand to discuss your commercial or industrial electrical requirements. Share your project details with us, and we’ll be in touch to discuss the scope, programme and a tailored, cost-effective solution.