Electrical supply, installation and commissioning for commercial air conditioning systems — dedicated circuit provision, circuit protection, isolator installation and full BS 7671 certification for VRF, split and multi-split configurations.

What the electrical side of an air conditioning project actually has to solve

01

Undersized electrical supply for the system specified

VRF and multi-split outdoor units carry significant electrical load. We assess the available supply, calculate the required circuit ratings and confirm whether the existing distribution can carry the additional demand before any equipment is ordered.

02

Circuit protection that doesn't meet manufacturer requirements

Equipment warranties and Building Regulations compliance both depend on correctly specified overcurrent protection and isolators. We design the electrical supply to the equipment manufacturer's technical requirements from the outset.

03

Coordinating electrical works with the refrigeration contractor

Air conditioning projects involve at least two specialist trades. We coordinate the electrical programme with the refrigeration engineer so containment routes, power points and commissioning sequences are aligned and neither trade is waiting on the other.

04

Lack of certification for Building Control and insurance

New air conditioning circuits must be notified under Part P and certified to BS 7671. We handle the notification, produce the test certificates and provide the completion certificate — ensuring your building records are complete at handover.

NHS
Eric Wright FM
Manchester Central
Beghelli Lighting
Thorn
CAFT - Children's Adventure Farm Trust
NHS
Eric Wright FM
Manchester Central
Beghelli Lighting
Thorn
CAFT - Children's Adventure Farm Trust

Technical detail

Standards & compliance

  • BS 7671 18th Edition — circuit design and protection
  • Part L compliance — energy metering and controls
  • F-gas Regulation coordination with refrigeration contractor
  • Equipment manufacturer wiring and protection requirements
  • BS EN 60529 IP rating for outdoor unit isolation

Circuit provision

  • Sub-main circuits from the main distribution board
  • Dedicated final circuits per indoor and outdoor unit
  • Correct cable sizing for inrush current and diversity
  • RCBO protection to equipment specification
  • Local lockable isolators and commissioning switches

System types supported

  • VRF / VRV multi-zone systems
  • Cassette and concealed duct indoor units
  • Wall-mounted split and multi-split systems
  • Computer room air conditioning (CRAC) units
  • Fresh air ventilation unit power supplies

Commissioning & documentation

  • Electrical commissioning to BS 7671
  • Test certificates and circuit schedules
  • As-installed distribution board schedules
  • Building Regulations Part P notification
  • Coordination with refrigeration commissioning engineer
Con-Tec Solutions — commercial electrical installation

The Numbers

Edition BS 7671

18th

All circuit designs, protection devices and cable sizing comply with the current edition of the IET Wiring Regulations.

Contact throughout

1pt

A single Con-Tec engineer coordinates the electrical works from design through to commissioning, liaising directly with your refrigeration contractor.

Documentation turnaround

48hr

Test certificates and circuit schedules submitted within 48 hours of commissioning completion.

Why specify Con-Tec

The Electrical Half Done Properly

01

Pre-order supply assessment

We assess the available supply capacity and circuit protection requirements before equipment is ordered, so the system can be installed as specified without costly late-stage electrical upgrades.

02

Refrigeration contractor coordination

We work directly with your refrigeration engineer to align containment routes, isolator positions and commissioning sequences — preventing programme delays caused by trade interface gaps.

03

Manufacturer-compliant protection

Equipment warranties depend on correctly specified circuit protection. We design to the manufacturer's published requirements and provide the electrical certification to evidence compliance.

04

Complete building records

Part P notification, test certificates, updated circuit schedules and commissioning records are all included — so your building compliance records are complete when the system goes live.

01

Supply Assessment

We review the available supply capacity against the proposed system load and confirm circuit protection and cable sizing before any equipment is ordered.

02

Design & Coordination

Circuit layout, containment routes and isolator positions are designed and shared with the refrigeration contractor to align both programmes before first fix.

03

Installation

Sub-mains, final circuits, isolators and commissioning switches installed to BS 7671 by NICEIC-approved engineers — coordinated with the refrigeration programme.

04

Commission & Certificate

All circuits tested and commissioned with the refrigeration engineer present. Test certificates, Part P notification and circuit schedules provided at completion.

NICEIC Approved Contractor
Constructionline Gold Member
International Powered Access Fedaration
Prefabricated Access Suppliers & Manufacturers Association

1 / 4

What our clients say

“Just a note to say that John and his team from Con-Tec Solutions have produced another outstanding performance on the refit of lighting in the atrium at BCW. Work carried out was done at an extremely high standard. All relevant risk assessments and method statements brought to site and adhered to. These guys really do set the standards that we should be expecting from all our contractors.”

Grant Metcalf, Eric Wright Facilities Management

Get a Quote

Ready to Start a Project?

Our team is on hand to discuss your commercial or industrial electrical requirements. Share your project details with us, and we’ll be in touch to discuss the scope, programme and a tailored, cost-effective solution.